News

Find out what we have been working on lately and stay up to date with industry news.

UPDATES AND INSTALLATIONS

We love to keep our customers up to date with our latest work as well as innovations, news and updates within the industry. Check back to see new additions to our portfolio.

Two marble fireplace installations

26 September 2021

We were asked to install two Capital Fireplaces marble surrounds in a property in South London. Both had the brick chambers exposed and the hearths tiled. The front room had a gas flue liner fitted for a gas stove installation. The back room was just left open.

Fireplace installation Essex

26 September 2021

Full fireplace installation with Nu Flame gas fire in Romford, Essex

Eco Stove fitted in East London

1 June 2021

With large renovation work in process at a house in Walthamstow a Tinderbox stove was installed. Fire opening made with fitting of slate hearths and plastering. Installation of the Eco stove with a new flue liner.

Paragon gas fire fitting in Colchester

10 May 2021

Existing tiled backing removed and replaced with honed granite. Gas supply moved below floor and a Paragon H E remote control fire fitted.

Stone fireplace and gas fire fitted Hertfordshire

9 May 2021

With no working chimney at the property a stone fireplace and Gazco balanced flue fire were installed.

Old stove replaced in Kent

21 April 2021

An old stove with no flue lining was removed from a property in Bexley Kent. A new flue liner fitted with a honed granite front and back hearth. A Tinderbox stove was then fitted. Brick opening ready to be painted.

Tinderbox Stove Installation

12 April 2021

Chimney breast opened up and original brick opening exposed. Slate hearths fitted and chimney lined with new chimney pot being fitted. Plaster around opening made good and Tinderbox wood burning stove fitted.

Flue liners fitted to house in Walthamstow

7 April 2021

A regular customer of ours asked for flues liners to be installed now while renovation work is being carried out on the property. Two flue liners and chimney cowls were installed with the redundant chimneys capped. Renovations are expected to be completed in the summer and we will be installing two Eco 2022 compliant stoves.

Wood Stove installed in Pub

5 April 2021

With the Angel pub getting ready for opening after lock down. We were instructed by the renovation builders to install a stove in the lounge area of the bar. Due to the age of the roof a 17m Nifty Lift cherry picker was used for chimney access.